Getting Started

2008-11-24 Shop Layout-2


  • The bench work is done
  • Lighting is installed.
  • The blue foam board is in place
  • Linda has painted the backdrop
  • A preliminary track plan has been printed and arranged
  • Initial fit of sturctures is underway
  • Temporary fascia board has been installed to hold foam in place
  • Shelf to hold DCC systems is installed