Work continues

2009-03-16 Shop Layout-2


  • Preliminary work on the Narrow gauge track is done - still waiting to build turnouts
  • Buldings are moving onto the layout
  • Standard gauge track is wired
  • Cup and throttle holders are installed
  • Card boxes are installed
  • Three systems (Digitrax, Lenz and NCE) are functional - great for demos
Copyright © Bruce F. Petrarca 2007 - 2017; All Rights Reserved