A single track cement culvert

On June 10, 2015, I finished a scratch built culvert for the final bridge I need to complete the main layout. The mine-to-stamp-mill track needs a replacement. That’ll come later.

Here is a photo of the culvert. I’ll be taking it to the AZ division NMRA meet this weekend to show. Then, it will be installed on the layout.

IMG 7398


After showing it at the Arizona division NMRA meet on June 13, 2015, it is now installed and ballasted on the RMP upstream from the patio. In the photo (below), you can see the old rail - hopefully to be weathered by exposure to the elements in Arizona - holding back boulders and rocks to allow drainage into the wash without loosing fill or ballast.

Fn3 single-track cemet culvert


Copyright © Bruce F. Petrarca 2007 - 2017; All Rights Reserved