Lots of wiring done

The good weather held - highs only in the 70s and a bit of rain one evening (actually, quite a bit - ½ inch). Thus, I was able to get all of the drops connected to the rails on the entire layout. There are a couple of sub-buses to install in the yard and a few drops left to solder to the bus in the inner loop.

Since I needed to re-lay the track to the depots (freight and passenger), I actually went ahead and graded it and leveled it.

Look for the information on how this wiring was done in my July 2015 column in Model Railroad Hobbyist magazine.

Copyright © Bruce F. Petrarca 2007 - 2017; All Rights Reserved